Ruth’s department has been meeting with the Communications department over the last few weeks to establish a checklist of tasks to be done in order to meet our May 29th launch date. We’ve all found it encouraging to be at this point in the process.
What do we yet need to do?
- About 1/2 of the illustrations need to be drawn.
Bill, our wonderful illustrator, had a very complicated hernia surgery, and several week’s recovery time. He’s still not back to full strength, so please pray for him.
- Text needs to be finalized for the slip-sleeve box that the curriculum will be put in.
Ruth worked on writing the first draft of this today.
- PowerPoint slides need to be finished.
Pray for Don as he finishes this project. We previewed the slides for several lessons last week. We think those who use these slides of illustrations and outline points will have a great tool for enhancing the lessons.
- We need to get the word out that the revision is ready for purchase.
Thankfully, the Communications department has great ideas for marketing. They have already produced a flier for those who have never heard of Chronological Teaching, and they are in the process of producing one for those who are familiar with this method of teaching.
Please pray:
- That we will think of everything that we need to consider.
- That Bill will be able to finish the illustrations soon.
- That Don will be able to finish the PowerPoint slides.
- For Ruth as she coordinates many aspects of this project.
- That Ruth will be able to find a sitter for Joy when she need to go to meetings.
Leave a Reply
You must be logged in to post a comment.