Sorry this post is a week late. Life happens.
You can see the pictures of my house as it stood last Friday. The front porch was done except for a ramp to bring your motorcycle in the house at night (here it’s unthinkable to let your motorcycle sleep anywhere but in the house)! My solar panels, fridge, and freezer were delivered. There were holes dug in the bathroom for plumbing (for the day that we’ll hopefully have running water). Some of the electric stuff (that will run on the solar panels) was installed!
There was also supposed to be tile work done in the bathroom and other stuff delivered, but the truck drivers were on strike so the materials weren’t able to get out there. But I heard that now the truck has been there to deliver supplies, and that the tiling on the wall of the bathroom (not the floor) in either my or Jen’s house is done. Progress continues to be made, slowly but surely. As the end draws near, it means that Jen and I have to be working on getting ready to move – packing, buying other supplies we need, and eventually saying our goodbyes. Thanks for your continued prayers!